Library Construction Updates

As the building construction goes on, we will be taking pictures and posting updates on this page.  We plan to update it weekly with a few photos of the progress of the project.

Note: Pictures are best viewed on Firefox or Google Chrome.

 

Week 31

March 15th – March 21st 2020

Here’s what the old space in the library looks like now!  The former meeting room will become the Storytime Room, the area where the circulation desk was is becoming the Maker Space, and the larger part of the space is becoming the RCU meeting room and the study rooms.

Click to see the full-size image (1/10)

Week 31

March 15th – March 21st 2020

Here’s what the old space in the library looks like now!  The former meeting room will become the Storytime Room, the area where the circulation desk was is becoming the Maker Space, and the larger part of the space is becoming the RCU meeting room and the study rooms.

Click to see the full-size image (2/10)

Week 31

March 15th – March 21st 2020

Here’s what the old space in the library looks like now!  The former meeting room will become the Storytime Room, the area where the circulation desk was is becoming the Maker Space, and the larger part of the space is becoming the RCU meeting room and the study rooms.

Click to see the full-size image (3/10)

Week 31

March 15th – March 21st 2020

Here’s what the old space in the library looks like now!  The former meeting room will become the Storytime Room, the area where the circulation desk was is becoming the Maker Space, and the larger part of the space is becoming the RCU meeting room and the study rooms.

Click to see the full-size image (4/10)

Week 31

March 15th – March 21st 2020

Here’s what the old space in the library looks like now!  The former meeting room will become the Storytime Room, the area where the circulation desk was is becoming the Maker Space, and the larger part of the space is becoming the RCU meeting room and the study rooms.

Click to see the full-size image (5/10)

Week 31

March 15th – March 21st 2020

Here’s what the old space in the library looks like now!  The former meeting room will become the Storytime Room, the area where the circulation desk was is becoming the Maker Space, and the larger part of the space is becoming the RCU meeting room and the study rooms.

Click to see the full-size image (6/10)

Week 31

March 15th – March 21st 2020

Here’s what the old space in the library looks like now!  The former meeting room will become the Storytime Room, the area where the circulation desk was is becoming the Maker Space, and the larger part of the space is becoming the RCU meeting room and the study rooms.

Click to see the full-size image (7/10)

Week 31

March 15th – March 21st 2020

Here’s what the old space in the library looks like now!  The former meeting room will become the Storytime Room, the area where the circulation desk was is becoming the Maker Space, and the larger part of the space is becoming the RCU meeting room and the study rooms.

Click to see the full-size image (8/10)

Week 31

March 15th – March 21st 2020

Here’s what the old space in the library looks like now!  The former meeting room will become the Storytime Room, the area where the circulation desk was is becoming the Maker Space, and the larger part of the space is becoming the RCU meeting room and the study rooms.

Click to see the full-size image (9/10)

Week 31

March 15th – March 21st 2020

Here’s what the old space in the library looks like now!  The former meeting room will become the Storytime Room, the area where the circulation desk was is becoming the Maker Space, and the larger part of the space is becoming the RCU meeting room and the study rooms.

Click to see the full-size image (10/10)

Week 29

March 1st – March 7th 2020

After being closed for two weeks, we finally reopened in our new space!  Meanwhile, construction has begun in the new space as they prepare to reconfigure it.

Click to see the full-size image (1/12)

Week 29

March 1st – March 7th 2020

After being closed for two weeks, we finally reopened in our new space!  Meanwhile, construction has begun in the new space as they prepare to reconfigure it.

Click to see the full-size image (2/12)

Week 29

March 1st – March 7th 2020

After being closed for two weeks, we finally reopened in our new space!  Meanwhile, construction has begun in the new space as they prepare to reconfigure it.

Click to see the full-size image (3/12)

Week 29

March 1st – March 7th 2020

After being closed for two weeks, we finally reopened in our new space!  Meanwhile, construction has begun in the new space as they prepare to reconfigure it.

Click to see the full-size image (4/12)

Week 29

March 1st – March 7th 2020

After being closed for two weeks, we finally reopened in our new space!  Meanwhile, construction has begun in the new space as they prepare to reconfigure it.

Click to see the full-size image (5/12)

Week 29

March 1st – March 7th 2020

After being closed for two weeks, we finally reopened in our new space!  Meanwhile, construction has begun in the new space as they prepare to reconfigure it.

Click to see the full-size image (6/12)

Week 29

March 1st – March 7th 2020

After being closed for two weeks, we finally reopened in our new space!  Meanwhile, construction has begun in the new space as they prepare to reconfigure it.

Click to see the full-size image (7/12)

Week 29

March 1st – March 7th 2020

After being closed for two weeks, we finally reopened in our new space!  Meanwhile, construction has begun in the new space as they prepare to reconfigure it.

Click to see the full-size image (8/12)

Week 29

March 1st – March 7th 2020

After being closed for two weeks, we finally reopened in our new space!  Meanwhile, construction has begun in the new space as they prepare to reconfigure it.

Click to see the full-size image (9/12)

Week 29

March 1st – March 7th 2020

After being closed for two weeks, we finally reopened in our new space!  Meanwhile, construction has begun in the new space as they prepare to reconfigure it.

Click to see the full-size image (10/12)

Week 29

March 1st – March 7th 2020

After being closed for two weeks, we finally reopened in our new space!  Meanwhile, construction has begun in the new space as they prepare to reconfigure it.

Click to see the full-size image (11/12)

Week 29

March 1st – March 7th 2020

After being closed for two weeks, we finally reopened in our new space!  Meanwhile, construction has begun in the new space as they prepare to reconfigure it.

Click to see the full-size image (12/12)

Week 26

February 9th – February 15th 2020

This is our last week before we move into the new space!  Some highlights include finishing the ceiling and lights, the counter top for the circulation desk being put in, and the bathrooms being finished.

Click to see the full-size image (1/10)

Week 26

February 9th – February 15th 2020

This is our last week before we move into the new space!  Some highlights include finishing the ceiling and lights, the counter top for the circulation desk being put in, and the bathrooms being finished.

Click to see the full-size image (2/10)

Week 26

February 9th – February 15th 2020

This is our last week before we move into the new space!  Some highlights include finishing the ceiling and lights, the counter top for the circulation desk being put in, and the bathrooms being finished.

Click to see the full-size image (3/10)

Week 26

February 9th – February 15th 2020

This is our last week before we move into the new space!  Some highlights include finishing the ceiling and lights, the counter top for the circulation desk being put in, and the bathrooms being finished.

Click to see the full-size image (4/10)

Week 26

February 9th – February 15th 2020

This is our last week before we move into the new space!  Some highlights include finishing the ceiling and lights, the counter top for the circulation desk being put in, and the bathrooms being finished.

Click to see the full-size image (5/10)

Week 26

February 9th – February 15th 2020

This is our last week before we move into the new space!  Some highlights include finishing the ceiling and lights, the counter top for the circulation desk being put in, and the bathrooms being finished.

Click to see the full-size image (6/10)

Week 26

February 9th – February 15th 2020

This is our last week before we move into the new space!  Some highlights include finishing the ceiling and lights, the counter top for the circulation desk being put in, and the bathrooms being finished.

Click to see the full-size image (7/10)

Week 26

February 9th – February 15th 2020

This is our last week before we move into the new space!  Some highlights include finishing the ceiling and lights, the counter top for the circulation desk being put in, and the bathrooms being finished.

Click to see the full-size image (8/10)

Week 26

February 9th – February 15th 2020

This is our last week before we move into the new space!  Some highlights include finishing the ceiling and lights, the counter top for the circulation desk being put in, and the bathrooms being finished.

Click to see the full-size image (9/10)

Week 26

February 9th – February 15th 2020

This is our last week before we move into the new space!  Some highlights include finishing the ceiling and lights, the counter top for the circulation desk being put in, and the bathrooms being finished.

Click to see the full-size image (10/10)

Week 25

February 2nd – February 8th 2020

The carpeting is being put in, tile in the bathroom is being completed, and finishing touches are being applied as we near the date for our move into our new space. 

Click to see the full-size image (1/8)

Week 25

February 2nd – February 8th 2020

The carpeting is being put in, tile in the bathroom is being completed, and finishing touches are being applied as we near the date for our move into our new space.

Click to see the full-size image (2/8)

Week 25

February 2nd – February 8th 2020

The carpeting is being put in, tile in the bathroom is being completed, and finishing touches are being applied as we near the date for our move into our new space.

Click to see the full-size image (3/8)

Week 25

February 2nd – February 8th 2020

The carpeting is being put in, tile in the bathroom is being completed, and finishing touches are being applied as we near the date for our move into our new space.

Click to see the full-size image (4/8)

Week 25

February 2nd – February 8th 2020

The carpeting is being put in, tile in the bathroom is being completed, and finishing touches are being applied as we near the date for our move into our new space.

Click to see the full-size image (5/8)

Week 25

February 2nd – February 8th 2020

The carpeting is being put in, tile in the bathroom is being completed, and finishing touches are being applied as we near the date for our move into our new space.

Click to see the full-size image (6/8)

Week 25

February 2nd – February 8th 2020

The carpeting is being put in, tile in the bathroom is being completed, and finishing touches are being applied as we near the date for our move into our new space.

Click to see the full-size image (7/8)

Week 25

February 2nd – February 8th 2020

The carpeting is being put in, tile in the bathroom is being completed, and finishing touches are being applied as we near the date for our move into our new space.

Click to see the full-size image (8/8)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (1/13)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (2/13)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (3/13)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (4/13)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (5/13)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (6/13)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (7/13)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (8/13)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (9/13)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (10/13)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (11/13)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (12/13)

Week 24

January 26th – February 1st 2020

This week, tile is being installed in the bathrooms, light fixtures are being put up, and the walls by the fireplace in the quite reading lounge (green) and YA section (yellow) were painted.

Click to see the full-size image (13/13)

Week 23

January 19th – January 25th 2020

New siding is being added to the building, which will be painted in the spring.  The windows are being finished with trim and a lot of work is going into the ceiling this week.

Click to see the full-size image (1/8)

Week 23

January 19th – January 25th 2020

New siding is being added to the building, which will be painted in the spring.  The windows are being finished with trim and a lot of work is going into the ceiling this week.

Click to see the full-size image (2/8)

Week 23

January 19th – January 25th 2020

New siding is being added to the building, which will be painted in the spring.  The windows are being finished with trim and a lot of work is going into the ceiling this week.

Click to see the full-size image (3/8)

Week 23

January 19th – January 25th 2020

New siding is being added to the building, which will be painted in the spring.  The windows are being finished with trim and a lot of work is going into the ceiling this week.

Click to see the full-size image (4/8)

Week 23

January 19th – January 25th 2020

New siding is being added to the building, which will be painted in the spring.  The windows are being finished with trim and a lot of work is going into the ceiling this week.

Click to see the full-size image (5/8)

Week 23

January 19th – January 25th 2020

New siding is being added to the building, which will be painted in the spring.  The windows are being finished with trim and a lot of work is going into the ceiling this week.

Click to see the full-size image (6/8)

Week 23

January 19th – January 25th 2020

New siding is being added to the building, which will be painted in the spring.  The windows are being finished with trim and a lot of work is going into the ceiling this week.

Click to see the full-size image (7/8)

Week 23

January 19th – January 25th 2020

New siding is being added to the building, which will be painted in the spring.  The windows are being finished with trim and a lot of work is going into the ceiling this week.

Click to see the full-size image (8/8)

Week 22

January 12th – January 18th 2020

The new building is bustling as we near the completion date for the new space.

Click to see the full-size image (1/10)

Week 22

January 12th – January 18th 2020

The new building is bustling as we near the completion date for the new space.

Click to see the full-size image (2/10)

Week 22

January 12th – January 18th 2020

The new building is bustling as we near the completion date for the new space.

Click to see the full-size image (3/10)

Week 22

January 12th – January 18th 2020

The new building is bustling as we near the completion date for the new space.

Click to see the full-size image (4/10)

Week 22

January 12th – January 18th 2020

The new building is bustling as we near the completion date for the new space.

Click to see the full-size image (5/10)

Week 22

January 12th – January 18th 2020

The new building is bustling as we near the completion date for the new space.

Click to see the full-size image (6/10)

Week 22

January 12th – January 18th 2020

The new building is bustling as we near the completion date for the new space.

Click to see the full-size image (7/10)

Week 22

January 12th – January 18th 2020

The new building is bustling as we near the completion date for the new space.

Click to see the full-size image (8/10)

Week 22

January 12th – January 18th 2020

The new building is bustling as we near the completion date for the new space.

Click to see the full-size image (9/10)

Week 22

January 12th – January 18th 2020

The new building is bustling as we near the completion date for the new space.

Click to see the full-size image (10/10)

Week 21

January 5th – January 11th 2020

Now that the holidays are past, construction is back in full swing!

Click to see the full-size image (1/10)

Week 21

January 5th – January 11th 2020

Now that the holidays are past, construction is back in full swing!

Click to see the full-size image (2/10)

Week 21

January 5th – January 11th 2020

Now that the holidays are past, construction is back in full swing!

Click to see the full-size image (3/10)

Week 21

January 5th – January 11th 2020

Now that the holidays are past, construction is back in full swing!

Click to see the full-size image (4/10)

Week 21

January 5th – January 11th 2020

Now that the holidays are past, construction is back in full swing!

Click to see the full-size image (5/10)

Week 21

January 5th – January 11th 2020

Now that the holidays are past, construction is back in full swing!

Click to see the full-size image (6/10)

Week 21

January 5th – January 11th 2020

Now that the holidays are past, construction is back in full swing!

Click to see the full-size image (7/10)

Week 21

January 5th – January 11th 2020

Now that the holidays are past, construction is back in full swing!

Click to see the full-size image (8/10)

Week 21

January 5th – January 11th 2020

Now that the holidays are past, construction is back in full swing!

Click to see the full-size image (9/10)

Week 21

January 5th – January 11th 2020

Now that the holidays are past, construction is back in full swing!

Click to see the full-size image (10/10)

Week 18

December 15th – December 21st 2019

A lot of work is getting done inside this week, including installing the sprinkler system, insulating the vents, and installing the furnace.  We also decided on colors for the exterior of the building.

Click to see the full-size image (1/12)

Week 18

December 15th – December 21st 2019

A lot of work is getting done inside this week, including installing the sprinkler system, insulating the vents, and installing the furnace.  We also decided on colors for the exterior of the building.

Click to see the full-size image (2/12)

Week 18

December 15th – December 21st 2019

A lot of work is getting done inside this week, including installing the sprinkler system, insulating the vents, and installing the furnace.  We also decided on colors for the exterior of the building.

Click to see the full-size image (3/12)

Week 18

December 15th – December 21st 2019

A lot of work is getting done inside this week, including installing the sprinkler system, insulating the vents, and installing the furnace.  We also decided on colors for the exterior of the building.

Click to see the full-size image (4/12)

Week 18

December 15th – December 21st 2019

A lot of work is getting done inside this week, including installing the sprinkler system, insulating the vents, and installing the furnace.  We also decided on colors for the exterior of the building.

Click to see the full-size image (5/12)

Week 18

December 15th – December 21st 2019

A lot of work is getting done inside this week, including installing the sprinkler system, insulating the vents, and installing the furnace.  We also decided on colors for the exterior of the building.

Click to see the full-size image (6/12)

Week 18

December 15th – December 21st 2019

A lot of work is getting done inside this week, including installing the sprinkler system, insulating the vents, and installing the furnace.  We also decided on colors for the exterior of the building.

Click to see the full-size image (7/12)

Week 18

December 15th – December 21st 2019

A lot of work is getting done inside this week, including installing the sprinkler system, insulating the vents, and installing the furnace.  We also decided on colors for the exterior of the building.

Click to see the full-size image (8/12)

Week 18

December 15th – December 21st 2019

A lot of work is getting done inside this week, including installing the sprinkler system, insulating the vents, and installing the furnace.  We also decided on colors for the exterior of the building.

Click to see the full-size image (9/12)

Week 18

December 15th – December 21st 2019

A lot of work is getting done inside this week, including installing the sprinkler system, insulating the vents, and installing the furnace.  We also decided on colors for the exterior of the building.

Click to see the full-size image (10/12)

Week 18

December 15th – December 21st 2019

A lot of work is getting done inside this week, including installing the sprinkler system, insulating the vents, and installing the furnace.  We also decided on colors for the exterior of the building.

Click to see the full-size image (11/12)

Week 18

December 15th – December 21st 2019

A lot of work is getting done inside this week, including installing the sprinkler system, insulating the vents, and installing the furnace.  We also decided on colors for the exterior of the building.

Click to see the full-size image (12/12)

Week 17

December 8th – December 14th 2019

This week much of the insulation, both interior and exterior, was put in, as well as drywall and ventilation.

Click to see the full-size image (1/12)

Week 17

December 8th – December 14th 2019

This week much of the insulation, both interior and exterior, was put in, as well as drywall and ventilation.

Click to see the full-size image (2/12)

Week 17

December 8th – December 14th 2019

This week much of the insulation, both interior and exterior, was put in, as well as drywall and ventilation.

Click to see the full-size image (3/12)

Week 17

December 8th – December 14th 2019

This week much of the insulation, both interior and exterior, was put in, as well as drywall and ventilation.

Click to see the full-size image (4/12)

Week 17

December 8th – December 14th 2019

This week much of the insulation, both interior and exterior, was put in, as well as drywall and ventilation.

Click to see the full-size image (5/12)

Week 17

December 8th – December 14th 2019

This week much of the insulation, both interior and exterior, was put in, as well as drywall and ventilation.

Click to see the full-size image (6/12)

Week 17

December 8th – December 14th 2019

This week much of the insulation, both interior and exterior, was put in, as well as drywall and ventilation.

Click to see the full-size image (7/12)

Week 17

December 8th – December 14th 2019

This week much of the insulation, both interior and exterior, was put in, as well as drywall and ventilation.

Click to see the full-size image (8/12)

Week 17

December 8th – December 14th 2019

This week much of the insulation, both interior and exterior, was put in, as well as drywall and ventilation.

Click to see the full-size image (9/12)

Week 17

December 8th – December 14th 2019

This week much of the insulation, both interior and exterior, was put in, as well as drywall and ventilation.

Click to see the full-size image (10/12)

Week 17

December 8th – December 14th 2019

This week much of the insulation, both interior and exterior, was put in, as well as drywall and ventilation.

Click to see the full-size image (11/12)

Week 17

December 8th – December 14th 2019

This week much of the insulation, both interior and exterior, was put in, as well as drywall and ventilation.

Click to see the full-size image (12/12)

Week 16

December 1st – December 7th 2019

This week, we get to see some insulation going into the walls.  Half of the windows have also been installed.

Click to see the full-size image (1/12)

Week 16

December 1st – December 7th 2019

This week, we get to see some insulation going into the walls.  Half of the windows have also been installed.

Click to see the full-size image (2/12)

Week 16

December 1st – December 7th 2019

This week, we get to see some insulation going into the walls.  Half of the windows have also been installed.

Click to see the full-size image (3/12)

Week 16

December 1st – December 7th 2019

This week, we get to see some insulation going into the walls.  Half of the windows have also been installed.

Click to see the full-size image (4/12)

Week 16

December 1st – December 7th 2019

This week, we get to see some insulation going into the walls.  Half of the windows have also been installed.

Click to see the full-size image (5/12)

Week 16

December 1st – December 7th 2019

This week, we get to see some insulation going into the walls.  Half of the windows have also been installed.

Click to see the full-size image (6/12)

Week 16

December 1st – December 7th 2019

This week, we get to see some insulation going into the walls.  Half of the windows have also been installed.

Click to see the full-size image (7/12)

Week 16

December 1st – December 7th 2019

This week, we get to see some insulation going into the walls.  Half of the windows have also been installed.

Click to see the full-size image (8/12)

Week 16

December 1st – December 7th 2019

This week, we get to see some insulation going into the walls.  Half of the windows have also been installed.

Click to see the full-size image (9/12)

Week 16

December 1st – December 7th 2019

This week, we get to see some insulation going into the walls.  Half of the windows have also been installed.

Click to see the full-size image (10/12)

Week 16

December 1st – December 7th 2019

This week, we get to see some insulation going into the walls.  Half of the windows have also been installed.

Click to see the full-size image (11/12)

Week 16

December 1st – December 7th 2019

This week, we get to see some insulation going into the walls.  Half of the windows have also been installed.

Click to see the full-size image (12/12)

Week 15

November 24th – November 30th 2019

Construction continues!  This week, we have some windows going in, and a great look at the front of our new building!

Click to see the full-size image (1/8)

Week 15

November 24th – November 30th 2019

Construction continues!  This week, we have some windows going in, and a great look at the front of our new building!

Click to see the full-size image (2/8)

Week 15

November 24th – November 30th 2019

Construction continues!  This week, we have some windows going in, and a great look at the front of our new building!

Click to see the full-size image (3/8)

Week 15

November 24th – November 30th 2019

Construction continues!  This week, we have some windows going in, and a great look at the front of our new building!

Click to see the full-size image (4/8)

Week 15

November 24th – November 30th 2019

Construction continues!  This week, we have some windows going in, and a great look at the front of our new building!

Click to see the full-size image (5/8)

Week 15

November 24th – November 30th 2019

Construction continues!  This week, we have some windows going in, and a great look at the front of our new building!

Click to see the full-size image (6/8)

Week 15

November 24th – November 30th 2019

Construction continues!  This week, we have some windows going in, and a great look at the front of our new building!

Click to see the full-size image (7/8)

Week 15

November 24th – November 30th 2019

Construction continues!  This week, we have some windows going in, and a great look at the front of our new building!

Click to see the full-size image (8/8)

Week 14

November 17th – November 23rd 2019

We’ve made some great progress this week, with the roof fully shingled and two of our brick walls put in.

Click to see the full-size image (1/10)

Week 14

November 17th – November 23rd 2019

We’ve made some great progress this week, with the roof fully shingled and two of our brick walls put in.

Click to see the full-size image (2/10)

Week 14

November 17th – November 23rd 2019

We’ve made some great progress this week, with the roof fully shingled and two of our brick walls put in.

Click to see the full-size image (3/10)

Week 14

November 17th – November 23rd 2019

We’ve made some great progress this week, with the roof fully shingled and two of our brick walls put in.

Click to see the full-size image (4/10)

Week 14

November 17th – November 23rd 2019

We’ve made some great progress this week, with the roof fully shingled and two of our brick walls put in.

Click to see the full-size image (5/10)

Week 14

November 17th – November 23rd 2019

We’ve made some great progress this week, with the roof fully shingled and two of our brick walls put in.

Click to see the full-size image (6/10)

Week 14

November 17th – November 23rd 2019

We’ve made some great progress this week, with the roof fully shingled and two of our brick walls put in.

Click to see the full-size image (7/10)

Week 14

November 17th – November 23rd 2019

We’ve made some great progress this week, with the roof fully shingled and two of our brick walls put in.

Click to see the full-size image (8/10)

Week 14

November 17th – November 23rd 2019

We’ve made some great progress this week, with the roof fully shingled and two of our brick walls put in.

Click to see the full-size image (9/10)

Week 14

November 17th – November 23rd 2019

We’ve made some great progress this week, with the roof fully shingled and two of our brick walls put in.

Click to see the full-size image (10/10)

Week 13

November 10th – November 16th 2019

 This week, despite the cold, we got a lot more progress on our roof!  Meanwhile, under the tarps we’re seeing the start of some brick work.

Click to see the full-size image (1/12)

Week 13

November 10th – November 16th 2019

This week, despite the cold, we got a lot more progress on our roof!  Meanwhile, under the tarps we’re seeing the start of some brick work.

Click to see the full-size image (2/12)

Week 13

November 10th – November 16th 2019

This week, despite the cold, we got a lot more progress on our roof!  Meanwhile, under the tarps we’re seeing the start of some brick work.

Click to see the full-size image (3/12)

Week 13

November 10th – November 16th 2019

This week, despite the cold, we got a lot more progress on our roof!  Meanwhile, under the tarps we’re seeing the start of some brick work.

Click to see the full-size image (4/12)

Week 13

November 10th – November 16th 2019

This week, despite the cold, we got a lot more progress on our roof!  Meanwhile, under the tarps we’re seeing the start of some brick work.

Click to see the full-size image (5/12)

Week 13

November 10th – November 16th 2019

This week, despite the cold, we got a lot more progress on our roof!  Meanwhile, under the tarps we’re seeing the start of some brick work.

Click to see the full-size image (6/12)

Week 13

November 10th – November 16th 2019

This week, despite the cold, we got a lot more progress on our roof!  Meanwhile, under the tarps we’re seeing the start of some brick work.

Click to see the full-size image (7/12)

Week 13

November 10th – November 16th 2019

This week, despite the cold, we got a lot more progress on our roof!  Meanwhile, under the tarps we’re seeing the start of some brick work.

Click to see the full-size image (8/12)

Week 13

November 10th – November 16th 2019

This week, despite the cold, we got a lot more progress on our roof!  Meanwhile, under the tarps we’re seeing the start of some brick work.

Click to see the full-size image (9/12)

Week 13

November 10th – November 16th 2019

This week, despite the cold, we got a lot more progress on our roof!  Meanwhile, under the tarps we’re seeing the start of some brick work.

Click to see the full-size image (10/12)

Week 13

November 10th – November 16th 2019

This week, despite the cold, we got a lot more progress on our roof!  Meanwhile, under the tarps we’re seeing the start of some brick work.

Click to see the full-size image (11/12)

Week 13

November 10th – November 16th 2019

This week, despite the cold, we got a lot more progress on our roof!  Meanwhile, under the tarps we’re seeing the start of some brick work.

Click to see the full-size image (12/12)

Week 12

November 3rd – November 9th 2019

This week we’ve got more supplies coming in, and more roof going up!

Click to see the full-size image (1/10)

Week 12

November 3rd – November 9th 2019

This week we’ve got more supplies coming in, and more roof going up!

Click to see the full-size image (2/10)

Week 12

November 3rd – November 9th 2019

This week we’ve got more supplies coming in, and more roof going up!

Click to see the full-size image (3/10)

Week 12

November 3rd – November 9th 2019

This week we’ve got more supplies coming in, and more roof going up!

Click to see the full-size image (4/10)

Week 12

November 3rd – November 9th 2019

This week we’ve got more supplies coming in, and more roof going up!

Click to see the full-size image (5/10)

Week 12

November 3rd – November 9th 2019

This week we’ve got more supplies coming in, and more roof going up!

Click to see the full-size image (6/10)

Week 12

November 3rd – November 9th 2019

This week we’ve got more supplies coming in, and more roof going up!

Click to see the full-size image (7/10)

Week 12

November 3rd – November 9th 2019

This week we’ve got more supplies coming in, and more roof going up!

Click to see the full-size image (8/10)

Week 12

November 3rd – November 9th 2019

This week we’ve got more supplies coming in, and more roof going up!

Click to see the full-size image (9/10)

Week 12

November 3rd – November 9th 2019

This week we’ve got more supplies coming in, and more roof going up!

Click to see the full-size image (10/10)

Week 11

October 27th – November 2nd 2019

This week we get to see all the progress that the builders have made with the new roof, as well as getting a peek inside some of the demolished buildings.

Click to see the full-size image (1/12)

Week 11

October 27th – November 2nd 2019

This week we get to see all the progress that the builders have made with the new roof, as well as getting a peek inside some of the demolished buildings.

Click to see the full-size image (2/12)

Week 11

October 27th – November 2nd 2019

This week we get to see all the progress that the builders have made with the new roof, as well as getting a peek inside some of the demolished buildings.

Click to see the full-size image (3/12)

Week 11

October 27th – November 2nd 2019

This week we get to see all the progress that the builders have made with the new roof, as well as getting a peek inside some of the demolished buildings.

Click to see the full-size image (4/12)

Week 11

October 27th – November 2nd 2019

This week we get to see all the progress that the builders have made with the new roof, as well as getting a peek inside some of the demolished buildings.

Click to see the full-size image (5/12)

Week 11

October 27th – November 2nd 2019

This week we get to see all the progress that the builders have made with the new roof, as well as getting a peek inside some of the demolished buildings.

Click to see the full-size image (6/12)

Week 11

October 27th – November 2nd 2019

This week we get to see all the progress that the builders have made with the new roof, as well as getting a peek inside some of the demolished buildings.

Click to see the full-size image (7/12)

Week 11

October 27th – November 2nd 2019

This week we get to see all the progress that the builders have made with the new roof, as well as getting a peek inside some of the demolished buildings.

Click to see the full-size image (8/12)

Week 11

October 27th – November 2nd 2019

This week we get to see all the progress that the builders have made with the new roof, as well as getting a peek inside some of the demolished buildings.

Click to see the full-size image (9/12)

Week 11

October 27th – November 2nd 2019

This week we get to see all the progress that the builders have made with the new roof, as well as getting a peek inside some of the demolished buildings.

Click to see the full-size image (10/12)

Week 11

October 27th – November 2nd 2019

This week we get to see all the progress that the builders have made with the new roof, as well as getting a peek inside some of the demolished buildings.

Click to see the full-size image (11/12)

Week 11

October 27th – November 2nd 2019

This week we get to see all the progress that the builders have made with the new roof, as well as getting a peek inside some of the demolished buildings.

Click to see the full-size image (12/12)

Week 10

October 20th – October 26th 2019

It’s exciting to see more vertical progress on the new library, not to mention the ongoing demolition of the adjacent building!

Click to see the full-size image (1/12)

Week 10

October 20th – October 26th 2019

It’s exciting to see more vertical progress on the new library, not to mention the ongoing demolition of the adjacent building!

Click to see the full-size image (2/12)

Week 10

October 20th – October 26th 2019

It’s exciting to see more vertical progress on the new library, not to mention the ongoing demolition of the adjacent building!

Click to see the full-size image (3/12)

Week 10

October 20th – October 26th 2019

It’s exciting to see more vertical progress on the new library, not to mention the ongoing demolition of the adjacent building!

Click to see the full-size image (4/12)

Week 10

October 20th – October 26th 2019

It’s exciting to see more vertical progress on the new library, not to mention the ongoing demolition of the adjacent building!

Click to see the full-size image (5/12)

Week 10

October 20th – October 26th 2019

It’s exciting to see more vertical progress on the new library, not to mention the ongoing demolition of the adjacent building!

Click to see the full-size image (6/12)

Week 10

October 20th – October 26th 2019

It’s exciting to see more vertical progress on the new library, not to mention the ongoing demolition of the adjacent building!

Click to see the full-size image (7/12)

Week 10

October 20th – October 26th 2019

It’s exciting to see more vertical progress on the new library, not to mention the ongoing demolition of the adjacent building!

Click to see the full-size image (8/12)

Week 10

October 20th – October 26th 2019

It’s exciting to see more vertical progress on the new library, not to mention the ongoing demolition of the adjacent building!

Click to see the full-size image (9/12)

Week 10

October 20th – October 26th 2019

It’s exciting to see more vertical progress on the new library, not to mention the ongoing demolition of the adjacent building!

Click to see the full-size image (10/12)

Week 10

October 20th – October 26th 2019

It’s exciting to see more vertical progress on the new library, not to mention the ongoing demolition of the adjacent building!

Click to see the full-size image (11/12)

Week 10

October 20th – October 26th 2019

It’s exciting to see more vertical progress on the new library, not to mention the ongoing demolition of the adjacent building!

Click to see the full-size image (12/12)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (1/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (2/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (3/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (4/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (5/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (6/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (7/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (8/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (9/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (10/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (11/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (12/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (13/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (14/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (15/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (16/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (17/18)

Week 9

October 13th – October 19th 2019

This week we have more walls going up, and some generous landscaping help from the Royal Credit Union.

Click to see the full-size image (18/18)

Week 8

October 6th – October 12th 2019

Despite some inclement weather, we’re still making some great progress.  This week we saw our first wall go up!

Click to see the full-size image (1/7)

Week 8

October 6th – October 12th 2019

Despite some inclement weather, we’re still making some great progress.  This week we saw our first wall go up!

Click to see the full-size image (2/7)

Week 8

October 6th – October 12th 2019

Despite some inclement weather, we’re still making some great progress.  This week we saw our first wall go up!

Click to see the full-size image (3/7)

Week 8

October 6th – October 12th 2019

Despite some inclement weather, we’re still making some great progress.  This week we saw our first wall go up!

Click to see the full-size image (4/7)

Week 8

October 6th – October 12th 2019

Despite some inclement weather, we’re still making some great progress.  This week we saw our first wall go up!

Click to see the full-size image (5/7)

Week 8

October 6th – October 12th 2019

Despite some inclement weather, we’re still making some great progress.  This week we saw our first wall go up!

Click to see the full-size image (6/7)

Week 8

October 6th – October 12th 2019

Despite some inclement weather, we’re still making some great progress.  This week we saw our first wall go up!

Click to see the full-size image (7/7)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (1/13)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (2/13)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (3/13)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (4/13)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (5/13)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (6/13)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (7/13)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (8/13)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (9/13)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (10/13)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (11/13)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (12/13)

Week 7

September 29th – October 5th 2019

This week we got to see a sample of the exterior brick wall, as well as watching the floor of the new library get poured.

Click to see the full-size image (13/13)

Week 6

September 22nd – 28th 2019

This week we have plumbers and electricians on site, as well as some beautiful weather!

Click to see the full-size image (1/7)

Week 6

September 22nd – 28th 2019

This week we have plumbers and electricians on site, as well as some beautiful weather!

Click to see the full-size image (2/7)

Week 6

September 22nd – 28th 2019

This week we have plumbers and electricians on site, as well as some beautiful weather!

Click to see the full-size image (3/7)

Week 6

September 22nd – 28th 2019

This week we have plumbers and electricians on site, as well as some beautiful weather!

Click to see the full-size image (4/7)

Week 6

September 22nd – 28th 2019

This week we have plumbers and electricians on site, as well as some beautiful weather!

Click to see the full-size image (5/7)

Week 6

September 22nd – 28th 2019

This week we have plumbers and electricians on site, as well as some beautiful weather!

Click to see the full-size image (6/7)

Week 6

September 22nd – 28th 2019

This week we have plumbers and electricians on site, as well as some beautiful weather!

Click to see the full-size image (6/7)

Week 5

September 15th – 21st 2019

The walls have been poured, and now the lot is being backfilled and being prepared for plumbers and electricians to come in later in the week!

Click to see the full-size image (1/8)

Week 5

September 15th – 21st 2019

The walls have been poured, and now the lot is being backfilled and being prepared for plumbers and electricians to come in later in the week!

Click to see the full-size image (2/8)

Week 5

September 15th – 21st 2019

The walls have been poured, and now the lot is being backfilled and being prepared for plumbers and electricians to come in later in the week!

Click to see the full-size image (3/8)

Week 5

September 15th – 21st 2019

The walls have been poured, and now the lot is being backfilled and being prepared for plumbers and electricians to come in later in the week!

Click to see the full-size image (4/8)

Week 5

September 15th – 21st 2019

The walls have been poured, and now the lot is being backfilled and being prepared for plumbers and electricians to come in later in the week!

Click to see the full-size image (5/8)

Week 5

September 15th – 21st 2019

The walls have been poured, and now the lot is being backfilled and being prepared for plumbers and electricians to come in later in the week!

Click to see the full-size image (6/8)

Week 5

September 15th – 21st 2019

The walls have been poured, and now the lot is being backfilled and being prepared for plumbers and electricians to come in later in the week!

Click to see the full-size image (7/8)

Week 5

September 15th – 21st 2019

The walls have been poured, and now the lot is being backfilled and being prepared for plumbers and electricians to come in later in the week!

Click to see the full-size image (8/8)

Week 4

September 8th – 14th 2019

Construction continues on the library, rain or shine!  This week we poured the foundation walls.

Click to see the full-size image (1/10)

Week 4

September 8th – 14th 2019

Construction continues on the library, rain or shine!  This week we poured the foundation walls.

Click to see the full-size image (2/10)

Week 4

September 8th – 14th 2019

Construction continues on the library, rain or shine!  This week we poured the foundation walls.

Click to see the full-size image (3/10)

Week 4

September 8th – 14th 2019

Construction continues on the library, rain or shine!  This week we poured the foundation walls.

Click to see the full-size image (4/10)

Week 4

September 8th – 14th 2019

Construction continues on the library, rain or shine!  This week we poured the foundation walls.

Click to see the full-size image (5/10)

Week 4

September 8th – 14th 2019

Construction continues on the library, rain or shine!  This week we poured the foundation walls.

Click to see the full-size image (6/10)

Week 4

September 8th – 14th 2019

Construction continues on the library, rain or shine!  This week we poured the foundation walls.

Click to see the full-size image (7/10)

Week 4

September 8th – 14th 2019

Construction continues on the library, rain or shine!  This week we poured the foundation walls.

Click to see the full-size image (8/10)

Week 4

September 8th – 14th 2019

Construction continues on the library, rain or shine!  This week we poured the foundation walls.

Click to see the full-size image (9/10)

Week 4

September 8th – 14th 2019

Construction continues on the library, rain or shine!  This week we poured the foundation walls.

Click to see the full-size image (10/10)

Week 3

September 1st – 7th 2019

As we roll into Week 3 of constructing the new library, we finally lay the concrete foundation.

Click to see the full-size image (1/8)

Week 3

September 1st – 7th 2019

As we roll into Week 3 of constructing the new library, we finally lay the concrete foundation.

Click to see the full-size image (2/8)

Week 3

September 1st – 7th 2019

As we roll into Week 3 of constructing the new library, we finally lay the concrete foundation.

Click to see the full-size image (3/8)

Week 3

September 1st – 7th 2019

As we roll into Week 3 of constructing the new library, we finally lay the concrete foundation.

Click to see the full-size image (4/8)

Week 3

September 1st – 7th 2019

As we roll into Week 3 of constructing the new library, we finally lay the concrete foundation.

Click to see the full-size image (5/8)

Week 3

September 1st – 7th 2019

As we roll into Week 3 of constructing the new library, we finally lay the concrete foundation.

Click to see the full-size image (6/8)

Week 3

September 1st – 7th 2019

As we roll into Week 3 of constructing the new library, we finally lay the concrete foundation.

Click to see the full-size image (7/8)

Week 3

September 1st – 7th 2019

As we roll into Week 3 of constructing the new library, we finally lay the concrete foundation.

Click to see the full-size image (8/8)

Week 2

August 25th – 31st 2019

There’s been lots of digging going on in our backyard as construction workers get ready to lay the foundation for the new library!

Click to see the full-size image (1/8)

Week 2

August 25th – 31st 2019

There’s been lots of digging going on in our backyard as construction workers get ready to lay the foundation for the new library!

Click to see the full-size image (2/8)

Week 2

August 25th – 31st 2019

There’s been lots of digging going on in our backyard as construction workers get ready to lay the foundation for the new library!

Click to see the full-size image (3/8)

Week 2

August 25th – 31st 2019

There’s been lots of digging going on in our backyard as construction workers get ready to lay the foundation for the new library!

Click to see the full-size image (4/8)

Week 2

August 25th – 31st 2019

There’s been lots of digging going on in our backyard as construction workers get ready to lay the foundation for the new library!

Click to see the full-size image (5/8)

Week 2

August 25th – 31st 2019

There’s been lots of digging going on in our backyard as construction workers get ready to lay the foundation for the new library!

Click to see the full-size image (6/8)

Week 2

August 25th – 31st 2019

There’s been lots of digging going on in our backyard as construction workers get ready to lay the foundation for the new library!

Click to see the full-size image (7/8)

Week 2

August 25th – 31st 2019

There’s been lots of digging going on in our backyard as construction workers get ready to lay the foundation for the new library!

Click to see the full-size image (8/8)

Week 1

August 18th – 24th 2019

Construction on the new library has finally begun!

Click to see the full-size image (1/9)

Week 1

August 18th – 24th 2019

Construction on the new library has finally begun!

Click to see the full-size image (2/9)

Week 1

August 18th – 24th 2019

Construction on the new library has finally begun!

Click to see the full-size image (3/9)

Week 1

August 18th – 24th

Construction on the new library has finally begun!

Click to see the full-size image (4/9)

Week 1

August 18th – 24th 2019

Construction on the new library has finally begun!

Click to see the full-size image (5/9)

Week 1

August 18th – 24th 2019

Construction on the new library has finally begun!

Click to see the full-size image (6/9)

Week 1

August 18th – 24th 2019

Construction on the new library has finally begun!

Click to see the full-size image (7/9)

Week 1

August 18th – 24th 2019

Construction on the new library has finally begun!

Click to see the full-size image (8/9)

Week 1

August 18th – 24th 2019

Construction on the new library has finally begun!

Click to see the full-size image (9/9)

 

208 Hud Street
Somerset, WI 54025

715.247.5228

somersetpl@somersetlibrary.org

 

Hours

MON, WED, FRI: 9 am - 6 pm

TUE, THU: 9 am - 7 pm

SAT: 9 am - 1 pm

 

Want to know more about the Somerset Public Library?

Stay informed by joining our online community!

Click on the icon above.